☎ +966 58 206 6989Kingdom of Saudi Arabia
سراة للاستشارات الهندسيةالعربية
Across the Kingdom

Project portfolio

A selection of our hydrology, slope and protection projects in Riyadh and across Saudi Arabia.

Engineer mapping rock joints on a road cut
Riyadh Region · Roads

Escarpment road cuttings, Tuwaiq

  • Rock mass mapping and kinematic analysis
  • Slide2 and RS2 stability analysis
  • RocFall rockfall simulation
  • Mesh, rock bolt and barrier scheme
Fallen rock on a mountain road below a cliff
Makkah Region · Roads

Escarpment highway near Taif

  • Rockfall hazard rating (RHRS)
  • RocFall3 3D trajectory modelling
  • Flexible barriers, 2,000 to 5,000 kJ
  • Pinned drapery and rock bolts
Grouting crew working on a slope
Asir Region · Roads

Mountain road slope stabilization, Abha

  • Rock bolts and pinned mesh
  • Self-drilling anchors and grouting
  • Slope drainage
  • Pull-out testing
Rockfall barrier on a steep slope above a road
Al Baha Region · Roads

Rockfall barrier installation

  • Energy-rated barrier installation
  • Post foundations and anchors
  • Residual height checks
  • Inspection and maintenance plan
Retaining walls at a highway interchange
Riyadh · Roads

Highway interchange retaining walls

  • Retaining wall design
  • Reinforced earth walls
  • Global stability checks
  • Drainage behind walls
Multi-cell box culvert carrying wadi flow
Jazan Region · Road Hydrology

Wadi crossings and highway culverts

  • Design storms and peak flows
  • Box and pipe culvert design
  • Outlet scour protection
  • Road embankment protection
Stormwater pipe installation in Riyadh
Riyadh · Road Hydrology

Urban storm drainage

  • Catchment and network modelling
  • Trunk stormwater pipes
  • Road drainage design
  • Urban flood mitigation
Stepped gabion walls beside a highway
Hail Region · Road Hydrology

Gabion and riprap protection for a highway

  • Gabion walls and mattresses
  • Riprap sizing
  • Channel bank protection
  • Installation supervision
Scour around a bridge pier after a flood
Northern Corridor · Railways

Railway bridge scour protection

  • Bridge pier scour assessment
  • Wadi hydraulics
  • Riprap and apron design
  • Embankment erosion protection
Portal stabilization works at a tunnel entrance
Madinah Region · Tunnels

Road tunnel portal stabilization

  • Portal face stability (RS2, UnWedge)
  • Rock bolts and sprayed concrete
  • Canopy tubes and forepoling
  • Portal drainage
Battery energy storage facility on a drained platform
Riyadh Region · Power

Battery energy storage system (BESS)

  • Design flood levels
  • Platform grading and drainage
  • Battery yard protection
  • Lender hydrology report
Solar PV plant with perimeter diversion channel
Al-Jouf · Renewables

Utility-scale solar PV plant

  • 2D flood mapping across the array
  • Diversion bunds and channels
  • Pile scour protection
  • Internal road crossings